EN GLB
Global / EN

Robe for Na Dubrovke Nightclub

Minsk-based sound and lighting design, sales and installation company Art Ramos Studio a.l.c, Robe’s distributor for Belarus, has specified and installed a Robe Club CT Series lighting rig into the Na Dubrovke nightclub in Mogilev, Belarus.

Minsk-based sound and lighting design, sales and installation company Art Ramos Studio a.l.c, Robe’s distributor for Belarus, has specified and installed a Robe Club CT Series lighting rig into the Na Dubrovke nightclub in Mogilev, Belarus.

The 500 capacity club is part of a brand new entertainment centre which, along with the club, also features restaurants, bars and a bowling centre. The club itself has 3 bars, and a large dancefloor over which the lights are installed.

Art Ramos Studio won a competitive tender to design, supply and install Na Dubrovke’s lighting and sound rigs. They were selected because their pitch offered the most flexibility combined with the most cost-efficient options.

The lighting design utilises 8 Robe ClubScan 250 CTs, 4 ClubSpot 600 CT and 4 ClubWash 600 CTs, all hung on two circular trusses.

The ClubScan 250s are dotted around the outer – and larger - of the two trusses, which also happens to be lower than the second one which is central and under the roof of the club. The Scans were specifically chosen for these positions because of their compact size. The 8 moving heads are installed on the smaller higher truss. “All of them make a huge impact on the space” says Art Ramos Studio director Valery Streltsov, adding that he was very impressed with the brightness of all the fixtures as well as their versatility.

There is also a small stage for DJs, live bands, floor shows and other assorted entertainments on the second level above the dancefloor, and to light this they have installed 6 Robe ClubScan 150s CT, four at the front and two at the back.

All the Robe lights in the club are controlled via a Robe DMX Control 1024 lighting desk straightforward to programme and offers plenty of playback options at the push of a button.

Art Ramos has been installing Robe products since 2003 and reckons they are among the most reliable on the market.

Discover more news

Investment
Robe LedPOINTE Hits it Off in the UK
17.7.2025
Robe LedPOINTE Hits it Off in the UK

Robe’s new LedPOINTE moving light is blazing a trail of interest across the UK market with rental and production companies investing in, and lighting designers and show operators loving this bright, versatile contemporary and – obviously – more sustainable version of Robe’s legendary original Pointe!

Investment
Companhia de Luz Invests in Robe
15.7.2025
Companhia de Luz Invests in Robe

Companhia de Luz is a busy rental and production company based in beautiful and vibrant Rio de Janeiro, Brazil, which is headed by lighting designer / DoP Arthur Farinon and this year is celebrating its 40th year since being founded by Arthur’s father, Juarez, in 1985.

Technical Support
RoboSpot Enhanced Compatibility and Control, Technical Documentation and Software Updates
14.7.2025
RoboSpot Enhanced Compatibility and Control, Technical Documentation and Software Updates

This Technical Newsletter provides an overview of a recent update to RoboSpot, new documentation and software releases for Robe fixtures. RoboSpot control now supports additional fixture models and Virtual Colour channels, while various fixes enhance reliability and workflow. New Service Manuals, Technical Bulletins and updated Spare Parts Price Lists are available for download. In addition, software updates for lighting fixtures introduce new features, performance improvements and bug fixes. Detailed notes for each fixture follow.

Cruise Ship
Robe Brings on the Sunshine for Carnival Cruises
11.7.2025
Robe Brings on the Sunshine for Carnival Cruises

A new Robe moving light rig has been installed in the 800-capacity ‘Liquid Lounge’ main theatre space aboard the Carnival Sunshine cruise ship, which stages a host of large-scale production shows, themed performances, and other entertainment events. This was undertaken during an extensive refurbishment of the vessel whilst in dry dock at the Chantier Naval de Marseille in Marseilles, France, earlier this year.

Read More